hibs.net Messageboard

Results 1 to 26 of 26
  1. #1

    when will the new stand be ready

    is it some time in september i heard before that they hope to have some of it ready for the start of the season,if we get a good europa draw what will the capacity be


  2. Log in to remove the advert

  3. #2
    Coaching Staff down-the-slope's Avatar
    Join Date
    Sep 2007
    Location
    East Lothian
    Posts
    10,000
    Blog Entries
    1
    when the builders are finished

  4. #3
    First Team Breakthrough since90plustwo's Avatar
    Join Date
    Jan 2010
    Posts
    370
    Gamer IDs

    Gamertag: FIN1875
    October i think

  5. #4
    @hibs.net private member .Sean.'s Avatar
    Join Date
    Nov 2009
    Location
    Haddington/ Newhaven
    Age
    33
    Posts
    10,448
    Quote Originally Posted by down-the-slope View Post
    This quote is hidden because you are ignoring this member. Show Quote
    when the builders are finished
    The guy only asked a question, so no real need for the wideo reply.



    As far as i'm aware early September is when we should be 'moving in'

  6. #5
    Coaching Staff --------'s Avatar
    Join Date
    Oct 2003
    Posts
    25,320
    Gamer IDs

    Gamertag: Eh? PSN ID: No comprendo, senor. Wii Code: What's a Wii?
    Quote Originally Posted by nairn hibee View Post
    This quote is hidden because you are ignoring this member. Show Quote
    is it some time in september i heard before that they hope to have some of it ready for the start of the season,if we get a good europa draw what will the capacity be

    More than half the decking is already up, AFAIK. If we get a good dry summer it should go quickly, and it might JUST be ready for the Europa qualifying tie if we're drawn away from home in the first leg.

    They're really cracking on with it and I have been told that they're up to and ahead of schedule right now.


    EDIT: according to the club, the contractors are hoping that at least part of the new stand will be open for the start of the season.
    Last edited by --------; 21-05-2010 at 06:01 PM.

  7. #6
    Testimonial Due Bob Box Fish's Avatar
    Join Date
    Apr 2006
    Location
    Leith
    Posts
    1,727
    Quote Originally Posted by Doddie View Post
    This quote is hidden because you are ignoring this member. Show Quote
    More than half the decking is already up, AFAIK. If we get a good dry summer it should go quickly, and it might JUST be ready for the Europa qualifying tie if we're drawn away from home in the first leg.

    They're really cracking on with it and I have been told that they're up to and ahead of schedule right now.


    EDIT: according to the club, the contractors are hoping that at least part of the new stand will be open for the start of the season.
    As long as its not the part facing the pitch then jobs a good un . . .

  8. #7
    @hibs.net private member woodythehibee's Avatar
    Join Date
    May 2005
    Location
    Edinburgh
    Age
    35
    Posts
    4,287
    i'm more worried about the pitch not being ready for the Europa game but would love the east to be ready for the league kick off.

  9. #8
    @hibs.net private member scoopyboy's Avatar
    Join Date
    May 2005
    Location
    Scoopsville
    Age
    64
    Posts
    12,002
    Quote Originally Posted by Doddie View Post
    This quote is hidden because you are ignoring this member. Show Quote
    More than half the decking is already up, AFAIK. If we get a good dry summer it should go quickly, and it might JUST be ready for the Europa qualifying tie if we're drawn away from home in the first leg.

    They're really cracking on with it and I have been told that they're up to and ahead of schedule right now.


    EDIT: according to the club, the contractors are hoping that at least part of the new stand will be open for the start of the season.
    I've read that as well Doddie but I can't see it on the grounds of health and safety.

    The stand will need a safety certificate from the council before it can be used, I don't see part certificates being issued.

  10. #9
    @hibs.net private member Mikey's Avatar
    Join Date
    Apr 2002
    Age
    56
    Posts
    56,091
    Does anyone know if it's going to be the same size as the other stands?

  11. #10
    @hibs.net private member HibbyAndy's Avatar
    Join Date
    Aug 2004
    Location
    Penicuik
    Age
    47
    Posts
    32,316
    Quote Originally Posted by Mikey View Post
    This quote is hidden because you are ignoring this member. Show Quote
    Does anyone know if it's going to be the same size as the other stands?

  12. #11
    @hibs.net private member Mikey's Avatar
    Join Date
    Apr 2002
    Age
    56
    Posts
    56,091
    Quote Originally Posted by HibbyAndy View Post
    This quote is hidden because you are ignoring this member. Show Quote

  13. #12
    Left by mutual consent!
    Join Date
    Dec 2007
    Posts
    1,510
    Quote Originally Posted by HibbyAndy View Post
    This quote is hidden because you are ignoring this member. Show Quote
    Who's the girl in your sig?

  14. #13
    @hibs.net private member HibbyAndy's Avatar
    Join Date
    Aug 2004
    Location
    Penicuik
    Age
    47
    Posts
    32,316
    Quote Originally Posted by sunshine1875 View Post
    This quote is hidden because you are ignoring this member. Show Quote
    Who's the girl in your sig?
    Ma burd

  15. #14
    Left by mutual consent!
    Join Date
    Dec 2007
    Posts
    1,510
    Quote Originally Posted by HibbyAndy View Post
    This quote is hidden because you are ignoring this member. Show Quote
    Ma burd

  16. #15
    @hibs.net private member hibee_nation's Avatar
    Join Date
    Apr 2002
    Location
    ARGYLL
    Age
    62
    Posts
    4,227
    Quote Originally Posted by HibbyAndy View Post
    This quote is hidden because you are ignoring this member. Show Quote
    Ma burd
    It's true, she even wrote a song about him called " Not Fair"

  17. #16
    Coaching Staff --------'s Avatar
    Join Date
    Oct 2003
    Posts
    25,320
    Gamer IDs

    Gamertag: Eh? PSN ID: No comprendo, senor. Wii Code: What's a Wii?
    Quote Originally Posted by scoopyboy View Post
    This quote is hidden because you are ignoring this member. Show Quote
    I've read that as well Doddie but I can't see it on the grounds of health and safety.

    The stand will need a safety certificate from the council before it can be used, I don't see part certificates being issued.
    That's what I thought, but I've seen it twice in the papers, and I'm sure there's something about it on the main board...

    I really wouldn't be totally surprised if it WAS ready on time, the rate it's going up.

    Quote Originally Posted by Mikey View Post
    This quote is hidden because you are ignoring this member. Show Quote
    Does anyone know if it's going to be the same size as the other stands?
    I know, Mikey.

    I just can't sleep for worrying about it - I'm worn to a frazzle.

    If there's one thing I just can't bear it's an altitudinal imbalance in my steel erections.

    (As the engineer once remarked to the actress.)

  18. #17
    Testimonial Due 1two's Avatar
    Join Date
    Jun 2006
    Location
    In a Caravan
    Posts
    3,498
    The stand is not due to be complete till late august.
    A partial handover is due for half the stand before start of the season.
    The club have requested the first fixture or 2 to be away from home.

    Its true that the structure is ahead of schedule but although it looks almost complete there is **** loads still to finish.

    The roof steel starts on Monday and it will probably look almost complete very soon but there is lots of internal works etc.

    I cant see it being ready for Europa qualifiers but you never know.

  19. #18
    @hibs.net private member BonnieFitbaTeam's Avatar
    Join Date
    Sep 2006
    Location
    Stonehaven
    Age
    57
    Posts
    562
    Quote Originally Posted by hibee_nation View Post
    This quote is hidden because you are ignoring this member. Show Quote
    It's true, she even wrote a song about him called " Not Fair"
    At Easter Road They Play.....

  20. #19
    Coaching Staff jgl07's Avatar
    Join Date
    Aug 2005
    Location
    Merchiston
    Posts
    7,809
    Quote Originally Posted by 1two View Post
    This quote is hidden because you are ignoring this member. Show Quote
    The stand is not due to be complete till late august.
    A partial handover is due for half the stand before start of the season.
    The club have requested the first fixture or 2 to be away from home.

    Its true that the structure is ahead of schedule but although it looks almost complete there is **** loads still to finish.

    The roof steel starts on Monday and it will probably look almost complete very soon but there is lots of internal works etc.

    I cant see it being ready for Europa qualifiers but you never know.
    There are not a lot of internal works. The stand is a shell with toilets and food outlets.

    In any event the Third Qualifying round is hardly likely to attract a massive crowd. The key will be getting the stand open for the Play-off Round 19/26 August. That is assuming that Hibs make it through!

  21. #20
    Flew in to Edin Airport today and got a great view of the hallowed ground. Noticed that Real Madrid have their name on their stand roof, and thought that it would be great if Hibs were to paint their name on the roof of the new and final stand that completes the stadium. It looks hugely impressive from the air and something we should be rightly proud of.

    Most of the planes that land from the east fly over ER. I'm torn between Hibs FC and Hibernian though

    Or maybe "EasterRoad4Ever" :) All rights reserved, of course
    Last edited by EasterRoad4Ever; 22-05-2010 at 05:56 PM.

  22. #21
    @hibs.net private member BT58's Avatar
    Join Date
    Jul 2004
    Location
    musselburgh
    Posts
    5,921
    Quote Originally Posted by EasterRoad4Ever View Post
    This quote is hidden because you are ignoring this member. Show Quote
    Flew in to Edin Airport today and got a great view of the hallowed ground. Noticed that Real Madrid have their name on their stand roof, and thought that it would be great if Hibs were to paint their name on the roof of the new and final stand that completes the stadium. It looks hugely impressive from the air and something we should be rightly proud of.

    Most of the planes that land from the east fly over ER. I'm torn between Hibs FC and Hibernian though

    Or maybe "EasterRoad4Ever" :)
    with all these DO-GOODERS+HEALTH+SAFETY,,,,dont think that will ever happen
    pity tho,,,,,,prefer the pitch thingy, where the home team have their name/logo imprinted on the pitch,,,,,,im sure i saw huddersfield on sky,and they had it
    might be another team[shared with rugby league]
    hb


  23. #22
    First Team Regular JoJo_07's Avatar
    Join Date
    May 2002
    Location
    Edinburgh
    Posts
    575
    Quote Originally Posted by EasterRoad4Ever View Post
    This quote is hidden because you are ignoring this member. Show Quote
    Flew in to Edin Airport today and got a great view of the hallowed ground. Noticed that Real Madrid have their name on their stand roof, and thought that it would be great if Hibs were to paint their name on the roof of the new and final stand that completes the stadium. It looks hugely impressive from the air and something we should be rightly proud of.

    Most of the planes that land from the east fly over ER. I'm torn between Hibs FC and Hibernian though

    Or maybe "EasterRoad4Ever" :) All rights reserved, of course
    Better not let this guy anywhere near the place.
    Last edited by JoJo_07; 22-05-2010 at 06:25 PM. Reason: "naughty" work in guardian link being removed so here is the BBC one.

  24. #23
    Ultimate Slaver Keith_M's Avatar
    Join Date
    Nov 2002
    Location
    In der Hölle
    Posts
    35,082
    What I want to know is, will it be finished before the Sooperdooperfiftymillionpoundmainstand at Tynecastle?

    I have to be honest, I'm worried they'll finish theirs first. They are the BigTeam after all!



  25. #24
    Coaching Staff Ritchie's Avatar
    Join Date
    Jul 2008
    Location
    Gilmerton
    Age
    39
    Posts
    5,477
    Gamer IDs

    Gamertag: Rich Tea12
    Quote Originally Posted by jgl07 View Post
    This quote is hidden because you are ignoring this member. Show Quote
    There are not a lot of internal works. The stand is a shell with toilets and food outlets.

    In any event the Third Qualifying round is hardly likely to attract a massive crowd. The key will be getting the stand open for the Play-off Round 19/26 August. That is assuming that Hibs make it through!


    what gives you that idea???

    i can see us easily selling out ER no matter who we get!!

  26. #25
    @hibs.net private member
    Join Date
    Jan 2010
    Posts
    303
    The pitch should be ready because a one of my friends work for the council and he deals with all the lighting and that and hibs are borrowing the big lights to help the grass grow

  27. #26
    Quote Originally Posted by Doddie View Post
    This quote is hidden because you are ignoring this member. Show Quote
    That's what I thought, but I've seen it twice in the papers, and I'm sure there's something about it on the main board...

    I really wouldn't be totally surprised if it WAS ready on time, the rate it's going up.



    I know, Mikey.

    I just can't sleep for worrying about it - I'm worn to a frazzle.

    If there's one thing I just can't bear it's an altitudinal imbalance in my steel erections.

    (As the engineer once remarked to the actress.)



    Just as long as the paint job matches the other stands. And the blinds. And the soft furnishings and toilet rolls.

    Right, I'm off to get my nails done before I embarrass myself.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
hibs.net ©2020 All Rights Reserved
- Mobile Leaderboard (320x50) - Leaderboard (728x90)